Hello all, new turner here. My workshop is in a detached building with a 3/4" plywood floor over a crawlspace. I have a Laguna Revo 1836 on backorder that should be coming in any day now. I originally planned on bolting it down to the joists but after further research I am concerned about vibration and would rather do it right and pour a concrete slab for it to sit on. The frost line here in Cleveland is at about 42" and trying to dig out a good 4' of earth between the joists for a proper footer will mean waiting for a thaw and a whole lot of digging and extra cost for material. Is this all overkill and am I overthinking this when there's an easier option or should I proceed as planned? Thanks.